Projects
EUROPEAN PROJECTS
PIXEL
Port IoT for Environmental Leverage
Programme: HORIZON 2020, Research and Innovation programme.
Project Νο: 769355.
Start: 01/05/2018. End: 30/09/2021. Duration: 41 months.
Budget: 4,890,222.50 €.
Partners: UPV (ES), PRO (ES), XLAB (SI), INSIEL (IT), CATIE (FR), Orange (FR), CREO (FR), MedRi (HR), SDAG (IT), ThPA (EL), PPA (EL), APT (IT), GPMB (FR), PEOPLE (UK), HIT/CERTH (EL). Subcontractor: ThPA (EL): UniPi (EL).
Lead Partner: UPV (ES).
Contract: SARF UniPi.
Role: Research Associate.
Website: https://pixel-ports.eu/
SUPAIR
SUstainable Ports in the Adriatic-Ionian Region
Programme: INTERREG Adriatic-Ionian (European Regional Development Fund [ERDF]).
Project Νο: -.
Start: 01/01/2018. End: 30/06/2020. Duration: 30 months.
Budget: 1,448,707.43 €.
Partners: AREA (IT), HIT/CERTH (EL), DPA (AL), LoK (SI), NASPA (IT), PPA (EL), PNAEAS (IT), PB (ME), ThPA (EL), VIU (IT). Subcontractor: ThPA (EL): AUTh (EL).
Lead Partner: AREA (IT).
Contract: SARF AUTh.
Role: Research Associate.
Website: https://supair.adrioninterreg.eu/
INNOTRANS
Enhancing transport innovation capacity of regions
Programme: INTERREG Europe (European Regional Development Fund [ERDF]).
Project Νο: PGI02182.
Start: 01/01/2017. End: 31/12/2021. Duration: 48 months.
Budget: 908,387.00 €.
Partners: CUE (UK), City of Prague (CZ), AUTh (EL), Abruzzo Region (IT), SE RDA (RO).
Lead Partner: CUE (UK).
Contract: SARF AUTh.
Role: Scientific Coordinator AUTh.
Website: https://www.interregeurope.eu/innotrans/
PE4Trans
Public Engagement for Sustainable Public Transport
Programme: INTERREG Europe (European Regional Development Fund [ERDF]).
Project Νο: PGI05173.
Start: 01/06/2018. End: 31/05/2023. Duration: 60 months.
Budget: 1,409,791.00 €.
Partners: PSTP (PL), SAKO (PL), CUE (UK), AUTh (EL), City of Valladolid (ES), District of Grafschaft Bentheim (DE).
Lead Partner: PSTP (PL).
Contract: SARF AUTh.
Role: Deputy Scientific Coordinator AUTh.
Website: https://www.interregeurope.eu/pe4trans/
SMiLe
Strengthening primary Medical care in Isolated and deprived cross-border arEas
Programme: European Territorial Cooperation Programme INTERREG V-A Greece – Bulgaria 2014-2020 (European Regional Development Fund [ERDF]).
Project Νο: 18SYMV003444283.
Start: 12/10/2017. End: 30/06/2021. Duration: 44 months.
Budget: 1,762,157.55 €.
Partners: 4th Health District of Macedonia and Thrace (EL), AUTh (EL), Multi-profile Hospital for Active Treatment of Ardino (BG), Municipality of Harmanli (BG), National Emergency Aid Center (EL).
Lead Partner: 4th Health District of Macedonia and Thrace (EL).
Contract: SARF AUTh.
Role: Research Associate.
Website: https://www.smile-interreg.eu/
CULTURAL DIPOLE
Creation of a CULTURAL DIPOLE in the cross border area
Programme: European Territorial Cooperation Programme INTERREG V-A Greece – Bulgaria 2014-2020 (European Regional Development Fund [ERDF])
Project Νο: B2.6c.11.
Start: 01/09/2017. End: 08/07/2022. Duration: 30 months.
Budget: 807,776.83 €.
Partners: HIT/CERTH (EL), AUTh (EL), PCTh (EL), BCCI (BG), RIA Smolyan (BG), SmCCI (BG), CCIT (AL), Ministry of Infrastructure and Energy (AL).
Lead Partner: HIT/CERTH (EL).
Contract: SARF AUTh.
Role: Deputy Scientific Coordinator AUTh.
Website: http://culturaldipole.eu/
SCOPE
Shared freight transport services connecting shipper and carrier operations
Programme: Transnational Cooperation Programme INTERREG V-B Balkan-Mediterranean 2014-2020 (European Regional Development Fund [ERDF]).
Project Νο: BMP1/1.1./2381/2019.
Start: 08/09/2019. End: 08/07/2022. Duration: 30 months.
Budget: 807,776.83 €.
Partners: HIT/CERTH (EL), AUTh (EL), PCTh (EL), BCCI (BG), RIA Smolyan (BG), SmCCI (BG), CCIT (AL), Ministry of Infrastructure and Energy (AL).
Lead Partner: HIT/CERTH (EL).
Contract: SARF AUTh.
Role: Scientific Coordinator AUTh.
Website: http://www.interreg-balkanmed.eu/approved-project/46/
Project Website: https://scope-app.net/
WorkAbility
Promoting employment for Persons with Disability in Northern Greece
Programme: Diversity, Inequalities and Social Inclusion (European Economic Area [EEA] Grants 2009-2014.
Project Νο: GR07/3923.
Start: 10/09/2015. End: 09/12/2016. Duration: 15 months.
Budget: 199,715.00 €.
Partners: AUTh (EL), PCTh (EL). Εξωτερικοί Συνεργάτες: Panhellenic Association of the Blind (EL), Panhellenic Association of Paraplegics (EL), Association of the Deaf of Northern Greece (EL).
Lead Partner: AUTh (EL).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://workability.gr/
CIPTEC
Collective Innovation for Public Transport in European Cities
Programme: HORIZON 2020, Research and Innovation programme.
Project Νο: 636412.
Start: 01/05/2015. End: 30/04/2018. Duration: 36 months.
Budget: 3,528,350.00 €.
Partners: AUTh (EL), KU Leuven (BE), Mobycon (NL), Tero (EL), MemEx (IT), WR (BE), Ortelio (UK), MRDH (NL), TIEMME (IT), traffiQ (DE), EPF (BE), EMTA (FR).
Lead Partner: AUTh (EL).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://ciptec.eu/
SmartMove
Active mobility consultancy focusing on feeder systems to increase awareness and use of public transport
Programme: Intelligent Energy Europe.
Project Νο: IEE/12/970/SI2.670555.
Start: 01/02/2014. End: 31/07/2016. Duration: 30 months.
Budget: 1,937,154.00 €.
Partners: BOKU (AT), AYTOBU (ES), NASA (DE), RC (DE), PK (PL), VRS (DE), AGENEAL (PT), AUTh (EL), REC (HU), UOY (UK), VVV (DE).
Lead Partner: BOKU (AT).
Contract: SARF AUTh.
Role: Deputy Scientific Coordinator AUTh.
Website: http://www.smartmove-project.eu/
CUTS
Clean Urban Transport Systems
Programme: European Territorial Cooperation Programme INTERREG IV-A Greece – Italy 2007-2013 (European Regional Development Fund [ERDF]).
Project Νο: -.
Start: 29/08/2013. End: 31/12/2015. Duration: 28 months.
Budget: 1,334,369.00 €.
Partners: Municipality of Corfu (EL), Municipality of Triggiano (IT). Subcontractor Municipality of Corfu (EL): STRATIS (EL).
Lead Partner: Municipality of Corfu (EL).
Contract: STRATIS (EL).
Role: Research Associate.
Website: https://keep.eu/projects/14644/Clean-Urban-Transport-Syste-EN/
ADB multiplatform
Adriatic-Danube-Black Sea multimodal platform
Programme: European Transnational Co-operation 2007-2013, South East Europe (SEE) Transnational Cooperation Programme, 3rd Strategic Call, AoI 3.3 Improve framework conditions for multi modal platforms (European Regional Development Fund [ERDF]).
Project Νο: SEE/C/0004/3.3/X.
Start: 01/04/2012. End: 31/12/2014. Duration: 33 months.
Budget: 5,646,970.00 €.
Partners: FVG (IT), VEN (IT), Levante (IT), AUTh (EL), ThPA (EL), PCTh (EL), NC MPA SA Constantza (RO), CCINA Costanta (RO), BMA (BG), BCCI (BG), Uni Lub (SI), PBN (HU), RSOE (HU), SŽ (SI), BDZ (BG), PGŽ (HR), KIP (HR), CCTirana (AL), Pirot (RS), DurresPA (AL), NJBMIH (AL), LUKA BAR (ME), MIT (IT), MIN Trans AU (AT), MDVRR SR (SK), Luka Koper (SI), VPA (IT), APT (IT), PU (IT), UC (IT), PCCI (BG), CFR Marfa (RO), Alpe Adria (IT), ZSSK Cargo (SK), Smolyan (BG), MoTMA (ME), PRA (HR), IARDI (UA), Zavod (HR), MIE SERBIA (RS), NFM (HU), BelCC (RS).
Lead Partner: FVG (IT).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://www.adbmultiplatform.eu/adb
SuPorts
Sustainable management for European local ports
Programme: Interregional Cooperation Programme INTERREG IVC (European Regional Development Fund [ERDF]).
Project Νο: 0648R2.
Start: 01/01/2010. End: 31/03/2013. Duration: 39 months.
Budget: 2,088,971.06 €.
Partners: Seine-Maritime (FR), APP (IT), East Sussex County Council (UK), AUTh (EL), ECOPORTS (BE), ISPRA (IT), Corfu Port Authority (EL), Portos de Galicia (ES), Port of Klaipėda (LT), CITTALIA (IT).
Lead Partner: Seine-Maritime (FR).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://www.seinemaritime.net/suports/
PROSPELASIS
Prospelasis of the Byzantine monuments of Thessaloniki
Programme: Conservation of European cultural heritage (European Economic Area [EEA] Grants 2004-2009).
Project Νο: EL0021.
Start: 24/04/2009. End: 30/04/2011. Duration: 24 months.
Budget: 500,000.00 €.
Partners: AUTh (EL), 9th Ephorate of Byzantine Antiquities (EL).
Lead Partner: AUTh (EL).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://prospelasis.com/
FLIPPER
Flexible Transport Services and ICT platform for Eco-Mobility in urban and rural European areas
Programme: Interregional Cooperation Programme INTERREG IVC (European Regional Development Fund [ERDF]).
Project Νο: 0126R1.
Start: 19/09/2008. End: 18/09/2011. Duration: 36 months.
Budget: 2,696,700.00 €.
Partners: SRM (IT), ATL (IT), ATAF (IT), AUTh (EL), BOKU (AT), Municipality of Purbach (AT), University of Aberdeen (UK), Municipality of Volos (EL), CIF (ES), Municipality of Almada (PT), RAL (IE).
Lead Partner: SRM (IT).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://www.interreg4cflipper.eu/
MEDRA
Mersin and Drama Municipalities’ Cooperation on Accessible Tourism
Programme: Promotion of the Civil Society Dialogue Between EU and Turkey (Central Finance And Contracts Unit of Turkey[CFCU]).
Project Νο: TR0604.01-01/81.
Start: 01/06/2008. End: 30/11/2009. Duration: 18 months.
Budget: 206,134.24 €.
Partners: Municipality of Toroslar (TR), Local Union of Communities and Municipalities of Drama area (EL). Subcontractors: Mersin University (TR), AUTh (EL).
Lead Partner: Municipality of Toroslar (TR).
Contract: Local Union of Communities and Municipalities of Drama area (EL).
Role: Research Associate.
Website: http://www.toroslar-bld.gov.tr/medra/index_tr.php
ACTUS
Accessibility Network for Turkish Greek societies
Programme: Promotion of the Civil Society Dialogue Between EU and Turkey (Central Finance And Contracts Unit of Turkey[CFCU]).
Project Νο: TR0604.01-03/024.
Start: 01/06/2008. End: 30/11/2009. Duration: 18 months.
Budget: 311,547.60 €.
Partners: Mersin University (TR), AUTh (EL).
Lead Partner: Mersin University (TR).
Contract: SARF AUTh (zero contract).
Role: Research Associate.
Website: http://actus.mersin.edu.tr/
SUNRISE
CohéSion sociale dans les zones UrbaiNes/Rurales basée sur services collectifs de mobilité InnovateurS et durablEs
Programme: Interregional Cooperation Programme INTERREG IIIC, South zone (European Regional Development Fund [ERDF]).
Project Νο: 2S0001I.
Start: 01/06/2004. End: 30/11/2005. Duration: 18 months.
Budget: 1,371,790.00 €.
Partners: ATAF (IT), UNEW (UK), CAT (IT), TERRASSA (ES), RAL (IE), AUTh (EL), DPB (SK).
Lead Partner: ATAF (IT).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://www.interreg3csunrise.com/
INFORMED
INtegrated system FOR an advanced and life-long training MEthodology of Dangerous goods drivers and trainers
Programme: Leonardo da Vinci Community Vocational Training Action Programme (2000-2006) (DG EDUCATION).
Project Νο: EL/PP/2002-114010.
Start: 30/12/2002. End: 29/12/2005. Duration: 36 months.
Budget: 580,041.00 €.
Partners: Seven (7) partners from five (5) EU countries.
Lead Partner: HIT/CERTH (EL).
Contract: HIT/CERTH (EL).
Role: Research Associate.
Website: http://www.intranet.imet.gr/Default.aspx?tabid=72&language=en-US
MAPLE
Ιmproving mobility and accessibility for people with learning difficulties in Europe
Programme: European Year for People with Disabilities 2003 (DG EMPL).
Project Νο: VP/2003/14.
Start: 01/01/2004. End: 31/01/2005. Duration: 12 months.
Budget: 127,004.24 €.
Partners: Merseytravel (UK), CTNERHI (FR), AUTh (EL), South Kildare Community Transport (IE), Lund University (SE), TTR (UK).
Lead Partner: Merseytravel (UK).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://www.maple-eu.com/
TRAINER
System for driver TRaining and Assessment using INteractive Evaluation tools and Reliable methodologies
Programme: 5th RTD Framework Programme, GROWTH KA2: Sustainable Mobility and Intermodality (DG TREN[VII]).
Project Νο: GRD1-1999-10024.
Start: 01/04/2000. End: 31/03/2003. Duration: 36 months.
Budget: 3,066,750.00 €.
Partners: BIVV-CARA (BE), VTI (SE), CRF (IT), USTUTT (DE), AUTh (EL), SIEM (EL), FOERST (DE), UPV (ES), RUG (NL), IfADo (DE), CIECA (BE), DKH (BE), EFA (BE).
Lead Partner: BIVV-CARA (BE).
Technical Coordinator: AUTh (EL).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://www.trainer.iao.fhg.de/
TRAVEL-GUIDE
TRAVELler and traffic information systems: GUIDElines for the enhancement of integrated information provision services
Programme: 5th RTD Framework Programme, GROWTH KA2: Sustainable Mobility and Intermodality (DG TREN[VII]).
Project Νο: GRD1-1999-10041.
Start: 01/04/2000. End: 31/03/2002. Duration: 24 months.
Budget: 2,161,257.00 €.
Partners:AUTh (EL), CT (EL), ATAF (IT), USTUTT (DE), CRF (IT), MIZAR (IT), RUG (NL), VTT (FI), IfADo (DE), ET&P (ES), NavTech (NL).
Lead Partner: AUTh (EL).
Contract: SARF AUTh.
Role: Research Associate.
Website: http://www.travel-guide.iao.fhg.de/
NATIONAL PROJECTS
PARKING
Προφίλ χρηστών των parking του Οργανισμού Λιμένος Θεσσαλονίκης
Αναθέτων: Οργανισμός Λιμένος Θεσσαλονίκης
Έναρξη: 19/07/2019. Λήξη: 30/09/2019. Διάρκεια: 3 μήνες.
Προϋπολογισμός: 5.580,00 €.
Υλοποίηση: ΑΠΘ.
Σύμβαση: ΕΛΚΕ ΑΠΘ.
Ρόλος: Ερευνητικός Συνεργάτης.
Website: https://www.thpa.gr/index.php/el/2014-01-04-21-47-14/parking
GREENPORTh II
Διερεύνηση περιβαλλοντικών ζητημάτων που τίθενται από την πιστοποίηση της ΟΛΘ ΑΕ κατά PERS και στοχεύουν στην αειφόρο ανάπτυξη του λιμένος της Θεσσαλονίκης
Αναθέτων: Οργανισμός Λιμένος Θεσσαλονίκης.
Έναρξη: 13/12/2004. Λήξη: 12/12/2005. Διάρκεια: 12 μήνες.
Προϋπολογισμός: 97.924,82 €.
Υλοποίηση: ΑΠΘ.
Σύμβαση: ΕΛΚΕ ΑΠΘ.
Ρόλος: Ερευνητικός Συνεργάτης.
Website: http://www.su-port.web.auth.gr/
OLPIS
Προς ένα ολοκληρωμένο σύστημα περιβαλλοντικής διαχείρισης της ΟΛΠ Α.Ε.
Αναθέτων: Οργανισμός Λιμένος Πειραιώς.
Έναρξη: 05/03/2004. Λήξη: 04/03/2005. Διάρκεια: 12 μήνες.
Προϋπολογισμός: 65.999,77 €.
Υλοποίηση: ΑΠΘ.
Σύμβαση: ΕΛΚΕ ΑΠΘ.
Ρόλος: Ερευνητικός Συνεργάτης.
Website: http://www.su-port.web.auth.gr/
ΣΕΚΑΝ
Κατάρτιση σχεδίου έκτακτης ανάγκης για την αντιμετώπιση περιστατικών ρύπανσης από επικίνδυνες και βλαβερές ουσίες
Αναθέτων: Οργανισμός Λιμένος Θεσσαλονίκης.
Έναρξη: 22/12/2003. Λήξη: 21/05/2004. Διάρκεια: 5 μήνες.
Προϋπολογισμός: 15.000,00 €.
Υλοποίηση: ΑΠΘ.
Σύμβαση: ΕΛΚΕ ΑΠΘ.
Ρόλος: Ερευνητικός Συνεργάτης.
Website: http://www.su-port.web.auth.gr/
ΑΔΗΡΙΤΟ
Ανθρώπινο δίκτυο για την προαγωγή και ισχυρή προώθηση της οδικής ασφάλειας
Πρόγραμμα: Ανταγωνιστικότητα, Μέτρο 8.3, Δράση 8.3.6: Ανθρώπινα Δίκτυα Ε&Τ Επιμόρφωσης (Γενική Γραμματεία Έρευνας και Τεχνολογίας).
No Έργου: 5.
Έναρξη: 10/05/2003. Λήξη: 10/05/2005. Διάρκεια: 24 μήνες.
Προϋπολογισμός: 170.000,00 €.
Εταίροι: IMET, ΑΠΘ, ΠΘ, ΘΕΣΣΑΛΟΝΙΚΗ, SAFETRACK.
Γενικός Συντονιστής: IMET.
Σύμβαση: ΕΛΚΕ ΑΠΘ.
Ρόλος: Ερευνητικός Συνεργάτης.
Website: http://www.intranet.imet.gr/Default.aspx?tabid=72&language=en-US
ΣΧΕΔΙΑΖΟΝΤΑΣ ΓΙΑ ΟΛΟΥΣ
Μετακίνηση, Προσβασιμότητα Ατόμων με Αναπηρίες – Σχεδιασμός για Όλους
Αναθέτων: Τεχνικό Επιμελητήριο Ελλάδος / Τμήμα Κεντρικής Μακεδονίας.
Έναρξη: 14/01/2003. Λήξη: 31/03/2003. Διάρκεια: 2 μήνες.
Προϋπολογισμός: 3.600,00 €.
Εταίροι: Μ. Ζουρνά, Ο. Καραγιάννη, Β. Κονιόρδος, Δ. Ναλμπάντης, Α. Νανιόπουλος, Ι. Τόσκας.
Σύμβαση: Τεχνικό Επιμελητήριο Ελλάδος / Τμήμα Κεντρικής Μακεδονίας.
Ρόλος: Ερευνητικός Συνεργάτης.
Website: http://portal.tee.gr/portal/page/portal/teetkm/DRASTHRIOTHTES/OMADESERGASIAS_PALIES/OE2000_2003/METAKINISI%20PROSBASIMOTHTA%20AMEA
INTERNAL AUTh PROJECTS